Stonework, brick, block, caulking, graffiti removal, fireplaces. Running Grand Canyon river support trips. Landline (435) 635-5034 Cell (435) 632-1178 westgreggs@msn.com
Saturday, June 10, 2017
Whitewater Dory
I got tired of bailing the rear footwell in the dory. Seems like it's always unoccupied. So I welded in a floor and some drain pipe. I used a small hatch so I can store things down there like beer or drinks or whatever. I added a piece of hose, painted it and there you are! No more bailing the back footwell! I like this so well I just might have to do the front footwell too.
Tuesday, May 30, 2017
Subscribe to:
Posts (Atom)